Assembling A Collaborative Team - Other - Page 85
3. Developed Design
4. Technical Design
4. Technical Design
D1 = Unique Ideas Architects
D2 = Green Timber Engineers
D3 = Good Ventilation Designs
C1 = Timber Structures Ltd
C2 = Hardwood Cladding Co.
C3 = White Render Ltd
C0 = Urban Construction Ltdor
List of parties with design responsibility
CDP
Note
Note 1D1 and D2 to liaise to fix design of visible structural connections between timber trusses prior to tender.
Note 2D1 to design timber cladding. Contractor to present options for final timber with tender to allow
sign-off prior to Building Contract being concluded.
Note 3D1 to include a number of compliant systems in specification with final selection determined by
contractor subject to approval.
Note 4 D1 to select system. Working drawing to be submitted for approval.
Info.
Exch.
D2 Out1:100D2 F(P)1:10N/AN/AN/ANo
D2
Out
1:100
D2
F(G)
1:100
C1
F(P)
1:5
Yes
1
D1Out
1:100
D1F(G)
1:5C2F(P)
N/A
No2
D1Out
1:100
D1P 1:5C3F(P)
1:5Yes
D1Out
1:50
D1F(G)
1:5C0F(P)
1:5No3
D1
Out
1:50
D1
F(P)
1:5
D1
F(P)
1:5
No
4
D1 Out1:50D1 F(G)1:5 N/AN/AN/ANo
D1 OutN/A D1 F(P)N/A N/AN/AN/ANo
D3 Out1:100D3 F(P)1:100
N/AN/AN/ANo
D3 Out1:100D3 F(P)1:100
N/AN/AN/ANo
Foundations
Structure including roof
Timber cladding
Render
Timber windows
Folding aluminium doors
Internal walls
Sanitaryware
Mechanical services
Electrical services
Info
Design
LOD
Exch.Resp.
Info.
Design
LOD
Exch. Resp.
Design
LOD
Resp.
Uniclass Element
ref
Aspect of design
Design team
Design team
Contractor
Building
Contract
Figure 7.3 Sample from a small project Design Responsibility Matrix
Example two: small project
RIBA Design Responsibility Matrix incorporating Information Exchanges
78