Assembling A Collaborative Team - Other - Page 140
133
Assembling a Collaborative Project Team
estimates 45–6, 82
two-stage design and build 25
cost consultant 26, 37, 56
Cost Information 36, 46, 82
design and build contracts 18, 19, 25, 53
design consultants 26
Design Framework for Building Services
(BG 6) 101
design management 26, 68, 103
Design Programme 39, 72, 86, 87, 90–1
design quality 18, 22
design responsibility 16, 19–20, 52, 53, 69
Design Responsibility Matrix 39, 40, 68–71,
74–80
design status schedule 82
design team
appointments 20
contractor-led 19–20, 22, 53
coordination 26
relation with contractor 51
traditional procurement 17
Employer’s Information Requirements (EIR)
98–9
Employer’s Requirements 42, 47
end users 24
facilities management (FM) adviser 57
Feasibility Studies 9, 43, 44
fee proposals 38, 47, 68, 73
Feedback 12, 70, 97
FIDIC see International Federation of
Consulting Engineers (FIDIC)
Final Project Brief 45
fire engineer 57
framework contractors 20
Building Information Model (BIM))
initial appointments 30–4
Initial Project Brief 9, 12, 42–5
Integrated Management System (IMS) 96
interior designer 57
International Federation of Consulting
Engineers (FIDIC)
Client/Consultant Model Services
Agreement 114
Conditions of Contract 116
Joint Contracts Tribunal (JCT)
Building Contracts 69, 115
Constructing Excellence contract
(JCT/CE) 117
consultancy agreement 113
landscape architect 57
lead designer
assembling the team 20, 38
relationship with project lead 11
role 19, 26, 39, 56, 59
Leading the Team: An Architect’s Guide to
Design Management 103
legislation 97
lighting designer 57
M&E designer role 59
management contracting 19, 25, 53
masterplanner 57
mechanical services designer 59
naming conventions 106
National BIM Library 102
NEC
Engineering and Construction Contract 115–16
Professional Services Contract (PSC) 113
Novation 19–20, 112
GC/Works 114, 116
operational lead 57
Handover Strategy 82, 101
hardware 105
health and safety adviser 56
Health and Safety Strategy 51
highways consultant 57
incentives 117
Information Exchanges 39, 40, 46–7,
72–3, 105
information manager 57
information technology (IT) 28, 105 (see also
www.ribaplanofwork.com
partnering contracts 116–17
party wall surveyor 57
performance specification 71
personal indemnity insurance (PII) 20
plain language questions 99
planning consents 88, 89
planning consultant 57
practice approach 31–2
pricing schedules 82